Line Idle
Shift A · Day Shift
--:--:--

Line Settings

Saved to the database and applied to the live dashboard immediately
Stations — crew and target cycle time
The target is what every over-target alarm, utilisation figure and bottleneck ranking is measured against
ST1
Passives — Resistors
24 insertions · 3.8s each
ST2
Passives — Capacitors
18 insertions · 5.0s each
ST3
Semiconductors
14 insertions · 6.4s each
ST4
Magnetics & Hardware
9 insertions · 10.0s each
ST5
Heat Sink & Camera Inspection
7 insertions · 12.9s each
Line takt (slowest target)90s
Theoretical 8 h capacity320 boards
Insertions per board72
Production plan
Drives the shift-target and achievement KPIs
81% of theoretical capacity at 90s takt
Set this to the committed plan rather than the theoretical maximum — the dashboard's pace line compares actual output against the elapsed share of it.
Alarm thresholds
When the Andon feed raises an alarm
5 min with a pallet on the stopper
ST1 alarms past 108s
Shift windows
Clock windows may wrap past midnight — shift C normally does
Shift A
Shift B
Shift C
Kurtz Ersa ERSA POWERFLOW — process setpoints
The process window the wave-solder page checks live telemetry against; a deviation beyond tolerance raises WS-101
Alarms outside 249–261°C
Topside board temperature entering the wave
≈ 145s nominal dwell inside the machine
Beyond twice this deviation the alarm escalates to critical
Saving writes the single settings row in the Netlify database and applies the values to the running engine without a reload. Operator names also re-label the live station cards, and a changed shift window recomputes the shift start that every KPI on the dashboard is scoped to.