Shift Reports
Power Driver PCB · Rev C · PO-2026-0641 · THT Assembly · Line 01 · Bay 2
Boards on this date
0bd
Live — today is still running
Shifts worked
0
None
Cycles recorded
0
0 camera verdicts
Day FTQ
—
ST5 first-time pass rate
Shift A
06:00 – 14:00
No cycles were recorded for this shift.
Shift B
14:00 – 22:00
No cycles were recorded for this shift.
Shift C
22:00 – 06:00
No cycles were recorded for this shift.
Station breakdown
Operator time consumption for the selected shift
| Station | Operator | Scope | Boards | Target | Avg | Min | Max | Over target | Hands-on | Waiting | Lost | Utilisation |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| No shift on this date has production to report. | ||||||||||||
Each shift is grouped by the label stamped on its records, so shift C reports as one block even though it crosses midnight. The window is the span from that shift's first to its last recorded cycle, and OEE is computed inside that window — a shift that started late is not penalised for the hours it was never assigned the line.