Line Idle
Shift A · Day Shift
--:--:--

Bottleneck Analysis

The slowest station caps the whole conveyor — everything upstream just builds queue
Takt 90s
Constraint station
No cycles yet
Constraint cycle
Line rate now
0UPH
Capped by ST—
Rate if fixed
40UPH
+40 UPH · ≈ 320 boards left this shift
Average cycle versus target
Bars turn red where the station is over target
Hourly drift
When each station started slowing down
Constraint ranking
Slowest first · balance the line by pulling work from the top row to the bottom
RankStationOperatorScopeAvgTargetΔ vs targetΔ vs taktMaxBoardsLostLoad vs takt
No cycles recorded for this shift yet.