Line Idle
Shift A · Day Shift
--:--:--

OEE Analytics

Shift A from --:-- · takt 90s · 0m of planned time
OEE 0.0%
Overall equipment effectiveness
Availability × Performance × Quality
Availability
Run time ÷ planned time
Performance
Takt × boards ÷ run time
Quality
Camera first-time pass rate
Planned production time
0m
Elapsed shift window
Actual run time
0m
Downtime
0m
Stoppages plus dashboard line holds
Capacity lost
0bd
Boards forgone to downtime and speed loss
Time-loss cascade
Where the planned shift time actually went
Planned production time0m
The whole shift window to now
− Downtime loss0m
Gaps between ST5 completions longer than 2.5 × takt, plus manual line holds
= Run time0m
− Speed loss0m
Run time above takt for the boards actually produced
− Quality loss0m
0 rejected boards × 90s
= Valuable operating time0m
Time that produced a good board at takt
Hourly output
Finished boards per hour, last 10 h
Availability is derived from the production record rather than a separate downtime log, so the figure survives a page reload. Performance uses the slowest station target as line takt (90s); quality is the ST5 camera's first-time pass rate, which is why a rework board never counts as good output.