Line Idle
Shift A · Day Shift
--:--:--
Plant
Indic EMS Electronics Pvt. Ltd. · Plant 2
Production order
PO-2026-0641
Product
Power Driver PCB · Rev C
Shift window
--:-- → now · 0m
Line takt
90s / board
SyncingOEE 0.0%
Shift Target
260bd
Pace to now · 0 bd
Boards Produced
0bd
+0 vs pace
Achievement
0%
Target 260 boards / shift
Line OEE
0.0%
A 100% · P 0% · Q 0%
First-Time Quality
0 camera rejects this shift
Throughput
0UPH
Avg cycle —
Downtime
0m
Ran 0m of 0m
Active Alarms
0
All acknowledged
Line Digital Twin
Lifter 01 → ST1–ST5 insertion → Kurtz Ersa wave solder → Lifter 02 · 14,500 mm
LIFT 01READYST 1IDLEST 2IDLEST 3IDLEST 4IDLEST 5IDLELIFT 02READYKURTZ ERSAWAVE SOLDERSTANDBY · 255°CAKSRMIPNRD
Zone A · InsertionZone B · Camera inspectionZone C · Wave solder
ST1IDLE
A. Kumar
avg / 90s0 bd
Passives — Resistors
ST2IDLE
S. Reddy
avg / 90s0 bd
Passives — Capacitors
ST3IDLE
M. Iqbal
avg / 90s0 bd
Semiconductors
ST4IDLE
P. Nair
avg / 90s0 bd
Magnetics & Hardware
ST5IDLE
R. Das
avg / 90s0 bd
Heat Sink & Camera Inspection
Active Alerts
Andon feed · newest first
ALL
0 unacknowledged · 0 total
No alarms — line nominal.
Current Constraint
Waiting for the first cycles…
Zone Status
Zone A · Component insertion
ST1–ST4 · resistors, caps, diodes, magnetics
IDLE
0/4 inserting
Zone B · Camera inspection
Pre-solder component presence, polarity and seating check
READY
FTQ —
Zone C · Kurtz Ersa wave solder
ERSA POWERFLOW · Nitrogen wave soldering
STANDBY
255°C · 0 bd
Shift energy0.0 kWh0